| 1. | Study on the safety velocity for concrete lining under p wave loading 波作用下衬砌混凝土的爆破安全振动速度研究 |
| 2. | Study on prefab concrete lining technology for open trench subway tunnels 地下铁道明挖区间隧道结构预制技术的研究 |
| 3. | Study on plunge pool concrete lining stability for flood dischare of a high arch dam 高拱坝泄水垫塘衬砌稳定性研究 |
| 4. | In - situ concrete lining 现场浇筑混凝土衬层 |
| 5. | In situ concrete lining 现浇混凝土衬层 |
| 6. | Gunite concrete lining 喷射混凝土衬砌 |
| 7. | Concrete lining segment 混凝土衬砌块 |
| 8. | The durability for concrete lining structure of highway - tunnel and the thickness of concrete cover 公路隧道混凝土衬砌结构的耐久性与保护层厚度 |
| 9. | Optimization design of tailrace surge chamber concrete lining layers for dachaoshan hydropower station 大朝山水电站尾水调压室混凝土衬砌分层优化设计 |
| 10. | In this thesis , the measure method for spray concrete and concrete lining was explained shortly and sweetly 本文简要介绍了隧道喷混凝土和二次衬砌的检测方法。 |